久久亚洲一区二区三区成人国产-ⅴa亚洲v天堂亚洲va久久-91麻豆激情视频-久久久久久99久久久精品网站-日韩视频亚洲在线-蜜臀tv国产一区二区三区-91久久精品国产91性色69-日韩精品人妻乱码中文字幕-久久精品一区二区在线观看,激情五月天av中文字幕,午夜国产一区二区三,国产18精品久久久久久久

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2455

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
泗洪县| 普兰店市| 密云县| 长海县| 陇西县| 荆州市| 沈阳市| 祁东县| 湟源县| 常熟市| 东明县| 商河县| 西华县| 肇庆市| 合川市| 城口县| 通化县| 大港区| 榆中县| 道孚县| 萍乡市| 石家庄市| 宽甸| 章丘市| 南江县| 柳林县| 永州市| 达孜县| 长岭县| 德州市| 保亭| 平度市| 栾川县| 邵东县| 上犹县| 定远县| 仙桃市| 长汀县| 远安县| 叶城县| 剑阁县|